To check whether the sheet piles remain properly interlocked, Volker Staal en Funderingen can fit the sheet piles with an electronic measurement system that checks the interlocking of the piles, throughout the installation process. These detectors are used mainly for intermediate piles in combi walls, with both sides of the piles being checked at the same time. Fitting this system on the sheetpiles can significantly reduce the risk of problems during excavatioon of the building pit.
For water-tight pits for tunnel and cellar construction or isolation pits for polluted soil. Usually used in combi walls in locations where pile deviationbs are expected or corners.
Name of project |
Client |
Rotterdam Maasvlakte, Quaywall Offshore Terminal |
Mobilis |
Antwerp, Kallopark |
Hye |
Antwerp, Insteekdok Albertdok |
Hye |
Antwerp, North Sea terminal |
Hye |
Rotterdam Maasvlakte, Quay wall Amazonehaven |
Besix |
Rotterdam Maasvlakte, Quay wall Maasvlakte 2 |
Comb. Van Hattum en Blankevoort / BAM Civiel |